📖 Chapter 8 of 12 · Green Energy - Advance 2 · Class 9–10
Chapter 8: Who Pays, Who Decides — and What Will You Build?
In this chapter
- Levelised cost: how engineers compare very different power plants.
- Subsidies, carbon pricing and the finances of distribution companies.
- A just transition for India’s coal districts.
- Careers and startups in clean energy. Meet Sumit from Chhattisgarh and Alisha from Maharashtra.
The Big Idea
Technology choices are also money and justice choices. Levelised cost of energy (LCOE) spreads a plant’s lifetime costs over the units it will generate, so different technologies can be compared fairly. But LCOE does not capture everything: the value of power when it is needed, the cost of pollution, or what happens to the people whose jobs depend on coal. Good energy policy weighs all of these.
Did You Know?
Around half a million people work directly in India’s coal sector, and whole districts depend on coal for jobs and public revenue. A just transition means planning new industries, retraining and income support before mines close, not after.
Story Time — Sumit’s Two Futures
Sumit, age 16 · Korba, Chhattisgarh
Sumit’s father has worked in the coalfields of Korba for twenty-two years. Coal paid for Sumit’s school fees, his sister’s college, and the roof over their heads.
In school, Sumit learned about emissions and the energy transition. At home, he heard a different worry: “If the mines close, what happens to us?” The town’s shops, buses and hospital all depend on mining wages.
His economics teacher gave the class a real task: design a transition plan for Korba. The students found that a district cannot simply be told to stop. They proposed solar manufacturing and maintenance jobs on reclaimed mine land, retraining for electricians and welders, pumped storage in old mine pits, and using the existing grid connections and railway lines that coal plants already have.
Sumit presented the plan with one sentence that silenced the room: “My father is not the problem. His job is part of the solution, if somebody plans for it.”
He now wants to study energy policy. “Someone has to make sure the transition arrives in Korba as an opportunity,” he says, “and not as a notice on a gate.”
Story Time — Alisha Builds a Business Case
Alisha, age 16 · Mumbai, Maharashtra
Alisha interned for two weeks at a small clean-energy company in Mumbai that installs rooftop solar for housing societies. She expected engineering. She got spreadsheets.
“The panels are the easy part,” her mentor said. “The hard part is money. A society does not have ₹30 lakh spare. So we pay for the system and sell them the electricity at a lower rate than the grid for fifteen years.”
Alisha learned to read a project’s numbers: capital cost, generation, tariff, maintenance, and the payback period. She also learned about risk. “What if the society stops paying? What if the roof is sold? Banks ask these questions before lending.”
She sat in on a call about green bonds — money raised specifically for projects that cut emissions — and realised that finance is as much a part of the energy transition as physics.
On her last day, her mentor listed the company’s twelve employees: three engineers, two electricians, an accountant, two sales staff, a data analyst, a lawyer and two technicians. “Every one of them works in clean energy,” she said. Alisha went home realising that her love of both maths and argument had a career waiting for it.
Levelised Cost — and What It Misses
LCOE ≈ (lifetime costs) ÷ (lifetime units generated). It lets us compare a solar plant with no fuel bill against a coal plant with decades of fuel purchases. Solar and wind now have among the lowest LCOEs in India — but a cheap unit at noon is worth less than a reliable unit at 8 p.m.
- Capital cost: renewables are capital-heavy and fuel-free; fossil plants are the reverse.
- Capacity factor sits in the denominator, so it strongly affects LCOE.
- System costs: storage, grid upgrades and backup must be counted when comparing variable and firm sources.
- External costs: health damage from air pollution and climate damage are real costs that markets often ignore. Carbon pricing tries to include them; India’s Carbon Credit Trading Scheme is a step in that direction.
People, Policy and Careers
The transition is not only built by engineers. It is financed, regulated, negotiated, maintained and explained by many kinds of people — which means there are many ways into it.
- Engineering & science: electrical, mechanical, chemical, materials, civil; plasma and nuclear physics.
- Skilled trades: solar technicians, electricians, welders, battery and EV service — in high demand, via ITIs and polytechnics.
- Data & software: forecasting wind and solar, optimising grids, managing charging networks.
- Policy, law & finance: regulation, tariffs, project finance, green bonds, carbon markets.
- Entrepreneurship: rooftop solar, battery swapping, recycling, efficient appliances, rural mini-grids.
🔢 Numbers Corner
Simple LCOE ≈ (capital cost ÷ lifetime units) + operating cost per unit, where lifetime units = capacity (kW) × 8,760 × capacity factor × years. Halving the capacity factor nearly doubles the cost per unit.
Myth or Fact?
Myth: The cheapest source of electricity is always the best choice for the grid.
Fact: Cost per unit is only one dimension. A grid also needs power at the right time and place, reliability, and a fair deal for the communities and workers affected.
🔬 Try it in the Green Energy Lab
Experiment with these ideas in Lab 7: Clean-Energy Career Explorer.
Solved Examples
Work it out first, then check the answer.
1. What does LCOE measure?
Show answer
Answer: The average cost per unit of electricity over a plant’s whole life, including construction, fuel and maintenance, divided by the total units generated.
2. A 1 MW solar plant costs ₹4.5 crore, runs 25 years at 19% capacity factor, with ₹5 lakh a year operating cost. Estimate its LCOE.
Show answer
Answer: Annual units = 1,000 × 8,760 × 0.19 ≈ 16.6 lakh units. Lifetime ≈ 4.16 crore units. Capital per unit ≈ 4.5 crore ÷ 4.16 crore ≈ ₹1.08; operating ≈ 5 lakh ÷ 16.6 lakh ≈ ₹0.30. LCOE ≈ ₹1.4 per unit (simplified, ignoring interest).
3. Why does a low capacity factor raise LCOE?
Show answer
Answer: The same construction cost is divided among fewer units of energy, so each unit must carry more of the capital cost.
4. What is a just transition?
Show answer
Answer: Planning the shift away from coal so that workers and coal-dependent districts get new industries, retraining and support before mines and plants close.
5. Name four different careers that clean energy needs.
Show answer
Answer: Examples: solar technician, power systems engineer, data analyst for forecasting, energy lawyer or policy analyst, project finance specialist, entrepreneur.
Check Your Understanding
A. Fill in the blanks
- The average lifetime cost per unit is abbreviated .
- Costs such as health damage from pollution, not paid by the polluter, are called costs.
- Planning fairly for coal workers and districts is called a transition.
- Money raised specifically for climate-friendly projects is called a green .
- India’s carbon market is the Carbon Credit Scheme.
B. True or False
- LCOE includes fuel costs over the plant’s life. ( ___ )
- A higher capacity factor lowers LCOE. ( ___ )
- Clean energy jobs are only for engineers. ( ___ )
- Cheap midday power is worth the same as reliable evening power. ( ___ )
C. Choose the correct option
- Renewables are typically (a) capital-heavy with no fuel cost (b) fuel-heavy with low capital cost (c) free
- A just transition mainly concerns (a) workers and communities (b) turbine blades (c) solar cells
- Which is a trade skill in demand? (a) solar technician (b) none (c) only PhDs
D. Answer in detail
- Explain why the cheapest LCOE is not automatically the best grid decision.
- Design a transition plan for a coal district, as Sumit’s class did.
- Describe a clean-energy career that matches your own strengths, and the subjects you would study.
Brain Buster
Find out who supplies electricity in your area, and what you pay per unit. Where does that money go — generation, wires or losses?
Check your understanding
Tap an answer to see if it is correct. This is just for practice — nothing is saved.
1. LCOE is…
- Lifetime cost divided by lifetime units
- The price of a solar panel
- A type of battery
Show answer
A. Lifetime cost divided by lifetime units
2. A lower capacity factor makes LCOE…
- Lower
- Higher
- Unchanged
Show answer
B. Higher
3. A just transition is about…
- Workers and coal-dependent communities
- Turbine maintenance
- Panel cleaning
Show answer
A. Workers and coal-dependent communities
4. External costs include…
- Health damage from air pollution
- The price of panels
- Bank interest
Show answer
A. Health damage from air pollution
5. Which is NOT usually a clean-energy career?
- Grid data analyst
- Energy lawyer
- None — all of these are
Show answer
C. None — all of these are