📖 Chapter 10 of 12 · Green Energy - Advance 2 · Class 9–10
Final Questions — All-Book
All chapters together · Total: 70 marks
A. Fill in the blanks (8 × 1 = 8 marks)
- Annual energy = capacity × 8,760 × factor.
- The maximum efficiency of a single-junction solar cell is about %.
- Grid frequency in India is held near Hz.
- Energy out divided by energy in for a store is the efficiency.
- In hydrogen direct reduction of iron, the by-product is .
- About % of cement’s CO₂ comes from limestone decomposing.
- Fusion energy out divided by heating energy in is called .
- Lifetime cost divided by lifetime units generated is called .
B. True or False (8 × 1 = 8 marks)
- A 1 MW solar plant and a 1 MW nuclear plant generate the same annual energy. ( ___ )
- Tandem solar cells can exceed the single-junction limit. ( ___ )
- Batteries are the cheapest way to store energy for several months. ( ___ )
- Electric drivetrains are more efficient than petrol engines. ( ___ )
- Clean electricity alone can decarbonise cement. ( ___ )
- A fusion power plant currently supplies electricity in India. ( ___ )
- A lower capacity factor raises the levelised cost per unit. ( ___ )
- Indian Railways has electrified almost all of its broad-gauge network. ( ___ )
C. Choose the correct option (8 × 1 = 8 marks)
- A 2 MW turbine generating 5,256 MWh a year has a capacity factor of (a) 20% (b) 30% (c) 50%
- Grid inertia comes mainly from (a) spinning generators (b) solar inverters (c) transmission lines
- India’s grid batteries mostly use (a) LFP (b) NMC (c) lead-acid
- An EV using 0.15 kWh/km over 100 km at ₹8/unit costs (a) ₹120 (b) ₹700 (c) ₹1,200
- Green hydrogen costs are dominated by (a) electricity price (b) water cost (c) pipeline length
- The D–T fusion reaction releases about (a) 1.6 MeV (b) 17.6 MeV (c) 176 MeV
- Most of the cost of a solar plant’s electricity is (a) fuel (b) capital (c) staff
- A just transition is mainly about (a) workers and communities (b) panel efficiency (c) grid frequency
D. Match the columns (6 × 1 = 6 marks)
| Term | Meaning |
|---|---|
| 25. Shockley–Queisser | Round-trip efficiency |
| 26. Capacity factor | Levelised cost of energy |
| 27. LCOE | 33% single-junction limit |
| 28. Triple product | Annual energy ÷ maximum possible |
| 29. 85–95% for batteries | Fusion ignition condition |
| 30. Regenerative braking | Energy recovered while slowing |
E. Short answers with working (7 × 2 = 14 marks)
- A 150 MW wind farm generates 394 GWh a year. Find its capacity factor.
- Explain why grid frequency falls when demand exceeds supply, and what operators do about it.
- Why can a tandem cell beat 33%, when silicon alone cannot?
- A 50 MWh battery charges with 55 MWh. State its round-trip efficiency and where the rest went.
- Compare the yearly CO₂ of a petrol car and an EV driven 15,000 km, stating your assumptions.
- Write the two iron-reduction reactions and explain why one is climate-friendly.
- What would it take for fusion to move from Q > 1 to a working power plant?
F. Long answers — any TWO (2 × 13 = 26 marks)
- You advise a state government with a 40 GW evening peak. Design a 2035 electricity mix. Justify each choice with capacity factors, storage duration and cost, and state the trade-offs you accept.
- Write a reasoned essay: “India should electrify transport before it cleans up industry.” Argue one side, then answer the strongest objection.
- A coal district of 3 lakh people faces the closure of its mines over fifteen years. Write a just-transition plan with timelines, jobs, retraining and finance.
- Compare fusion, small modular reactors and grid batteries as answers to the evening-peak problem, in terms of timeline, cost and risk.
How did I do?
56–70: Ready for an engineering or policy course · 42–55: Strong grasp; revisit the calculations · Below 42: Rework the Numbers Corners and the Lab, then try again.